p73 states that . Half of all hazardous and non-hazardous waste produced by our mines was recycled or reused, mostly by external service providers. therefore half of the 12.8Mt is 6.4Mt.
12.8Mt x10e6 =12,800,000 Tonnes
6.4Mtx10e6=6,400,000
answer within the report is shown in Mt