Higher Education Statistics Agency (HESA)+Other works waste mass incineration (tonnes)
0

Other works waste mass incineration (tonnes)

What is the total waste mass (in tonnes) from all works of construction, demolition, and excavation not captured elsewhere that is incinerated?
Company
Industry
Project
search
Year
Metric value
Companies Values
Aston University
2016 = 0 tonnes
Bournemouth University
2016 = 0 tonnes
University of Worcester
2015 = 0 tonnes
Bangor University
2016 = 0 tonnes
Aberystwyth University
2016 = 0 tonnes
University of Dundee
2015 = Unknown tonnes

Export: csv / json

Designed By
Topics
Metric Type
Researched
Research Policy
Community
Report Type
Corporate Social Responsibility Report
Value Type
Number
Unit:
tonnes
Range:

About
This field contains data about the waste mass from all works of construction, demolition and excavation not elsewhere captured that is incinerated. The value can be recorded to three decimal places. This is applicable to higher education providers (HEP) in Scotland, England, Wales and Northern Ireland.

Reason required: sector use and benchmarking.
Methodology
This figure is for the waste mass (tonnes) from all works of construction, demolition, and excavation not captured elsewhere that is incinerated.

Please note that HEPs in England, Northern Ireland or Wales will need to return a value for this field to ensure that the mandatory field Total waste mass incineration is calculated correctly.
Bulk Import