Daimler AG

Daimler AG

Metric value
Year
Metric
Project
Research Policy
Importance
Metric type
Metrics Value

Scope 2 Emissions

2014 = 2.3M tonnes

Scope 1 Emissions

2014 = 1.05M tonnes

Environmental Fines (G4-EN29-a)

2015 = $ Unknown

Direct greenhouse gas (GHG) emissions (Scope 1) (G4-EN15-a)

2015 = 1.06M tonnes CO2 equivalent

Performance Score

2014 = A /A,A-,B,C,D,E

Indirect greenhouse gas (GHG) emissions (Scope 2) (G4-EN16-a)

2015 = 2.17M tonnes CO2 equivalent

Total Scope 1 and 2 (tCO2e)

2013 = 3547000

Hazardous Waste Created (G4-EN23-a)

2015 = 118 tonnes

Greenhouse Gas (GHG) emissions intensity ratio (G4-EN18-a)

2015 = Unknown : 1

Energy intensity (G4-EN5-a)

2015 = Unknown : 1

Hazardous Waste Recycled (G4-EN23-a)

2015 = 71 tonnes

Non-Hazardous Waste (G4-EN23-a)

2015 = Unknown tonnes

Performance Band

2016 = E+

Total water discharge (G4-EN22-a)

2015 = Unknown m3

Organisation Score

2016 = 37 %

Relationship Score

2016 = 40 %

Engagement Intensity

2016 = 17 %

Volatile Organic Compounds (VOC) emissions (G4-EN21-a)

2015 = 7,321 tonnes

Combined Scope 1, 2 and 3 Intensity

2013 = 1090.71

Reduction of greenhouse gas (GHG) emissions (G4-EN19-a)

2015 = Unknown tonnes CO2 equivalent

Export: csv / json

Headquarters

Integrations

Wikipedia